Company Introduction
1)Linyi Chensheng Casting Co., Ltd is located in Linyi City, Shandong Province, a well known logistics city, near Qingdao Port so that the transport is very convenient.
2)Production technology: investment casting/lost wax /sand casting
3)Facilities and equipments: silica sol medium-temperature precision casting production lines, 10 wax injection machine, 1 wax removel machine, 2 roasters, 5 shot blasting and 2 sand removal machines, 4 chamferring machine, 6 rough grinding machines and we have advanced inpsection instruments.
4)Material can be casted: high carbon steel, stainless steel, alloy steel, such as 304 316 316L 410 420 430 440 2205 17-4PH 1020 42CrMo and so on.
5)Weight limit:2g-50kg
6)Monlty output: 80tons precsion casting parts
7)Staff number: 87 persons for casting production line, we have 5 rich experienced engineers and a stict quality-control team and 15persons for machining center
8)Products refers to: automobile parts, mechanical components, pump valve and pipe fittings parts, kitchen hardware parts, bathroom hardware, construction hardware, marine hardware and so on.
10)Company basic principle: Quality Uppermost, Customer First.
Product Introduction.
Products Showing
Production Process
Our Workshop
Our Testing Equipments
Our Overseas Exhibtion Showing
FAQ
1. How many days it will take to develop one new item?
It will take about 20days to make molds and make samples for your checking.
2. What is your common delivery time for a bulk production?
Commonly 20-30days after prepayment paid
3. If we do not have related drawings, could you make drawing for us?
Yes, we can. Only you offer us detail information about your samples, our engineer can make correct drawings for you.
4. What is common payment terms?
TT full payment for molds, then samples confirmed. The 30% TT prepayment should be arranged, then balance against BL copy.
1)Linyi Chensheng Casting Co., Ltd is located in Linyi City, Shandong Province, a well known logistics city, near Qingdao Port so that the transport is very convenient.
2)Production technology: investment casting/lost wax /sand casting
3)Facilities and equipments: silica sol medium-temperature precision casting production lines, 10 wax injection machine, 1 wax removel machine, 2 roasters, 5 shot blasting and 2 sand removal machines, 4 chamferring machine, 6 rough grinding machines and we have advanced inpsection instruments.
4)Material can be casted: high carbon steel, stainless steel, alloy steel, such as 304 316 316L 410 420 430 440 2205 17-4PH 1020 42CrMo and so on.
5)Weight limit:2g-50kg
6)Monlty output: 80tons precsion casting parts
7)Staff number: 87 persons for casting production line, we have 5 rich experienced engineers and a stict quality-control team and 15persons for machining center
8)Products refers to: automobile parts, mechanical components, pump valve and pipe fittings parts, kitchen hardware parts, bathroom hardware, construction hardware, marine hardware and so on.
10)Company basic principle: Quality Uppermost, Customer First.
Product Introduction.
casting technology | investment casting/silic sol investment casting/lost wax casting |
casting material | carbon steel, stainless steel, alloy steel and etc |
material standard | AISI JIS GB DIN EN ASME |
casting parts range | automobile parts, machinery parts, marine hardware parts, door lock parts, pump valve and pipe fittings parts, bathroom hardware, kitchen hardware and so on |
casting weight | 2g-70kg |
surface finishing | sand blasting, stain polishing, mirror polishing, chrome plated, painted or as customer's request |
machining | milling, drilling, grinding, CNC machining |
delivery time | 15days for making molds and samples confirming, then 25-30days for trial order |
Products Showing
Production Process
Our Workshop
Our Testing Equipments
Our Overseas Exhibtion Showing
FAQ
1. How many days it will take to develop one new item?
It will take about 20days to make molds and make samples for your checking.
2. What is your common delivery time for a bulk production?
Commonly 20-30days after prepayment paid
3. If we do not have related drawings, could you make drawing for us?
Yes, we can. Only you offer us detail information about your samples, our engineer can make correct drawings for you.
4. What is common payment terms?
TT full payment for molds, then samples confirmed. The 30% TT prepayment should be arranged, then balance against BL copy.